VNA Checkliste

1. Manufacturer / OEM / Technical Support

2. Project Data

Customer adress

Warehouse adress

Planned project implementation

3. General truck data

i
i
i
i

Includes any advanced or external charger that charges the battery without removing it. For example, if the project is planned for 24h/7T operation.

Examples Charging the truck while operating in the aisle / parking outside the aisle in a "drive-in" charging station.

i
i

4. Specific Truck Data

Fahrzeug
i
i
i
i
Fahrzeug
i
i
i
i
Fahrzeug
i
i
i
i

5. General Warehouse data

i
i
i
i
i

6. Spefific Warehouse data

i
Lagerhaus
i
i
i
Lagerhaus
i
i
i
Lagerhaus
i
i
i
Lagerhaus
i
i
i
Lagerhaus
i
i
i

7. Optional training (only for international projects, not required for national projects)

After the installation 2-3 of the local technician(s) will be trained to perform future first level supports on the ELOprotect system by themselves (know the ELOprotect functions, solve common problems, exchange common spare parts, read out diagnosis data, reset system etc.) or by contacting our hotline. Additionally, the local technician(s) will receive ELOKON’s diagnosis kit: with this kit the local technician(s) on client site will be able to connect to the ELOprotect system and get diagnostical information if required.

Please add 9 and 9.